24 - Master Schedule Summary Report – MSSR
PAD Location: Synergy SIS>Mass Scheduling>Schedule Control>Master 
 Builder Option Set
The purpose of Master Schedule Summary Report is to give an overall 
 view of what occurred during the entire scheduling run. This is one of 
 the key reports that should be analyzed after each simulation run.
The Master Schedule Summary Report displays the statistics for each 
 step of the builder process. The Builder section shows statistics relevant 
 to the building process while the Loader-Resolver-Balancer section shows 
 statistics related to scheduling students.
The two most important columns in this report are Required Percent 
 and Scheduled Percent.
