21 - Master Schedule Build Seq Report – MSBSR

PAD Location: Synergy SIS>Mass Scheduling>Schedule Control>Master Builder Option Set

The purpose of the Master Schedule Build Seq Report is to view the order in which the sections were created by the builder during the scheduling run.

The report lists all course sections. Each section shows the period, the meeting days, the term, the teacher, the room, the number enrolled, and breaks out the number of students enrolled by gender, grade level, and other student properties.

closed.gifReport Details

22msbsr.gif

Related Topics