21 - Master Schedule Build Seq Report – MSBSR
PAD Location: Synergy SIS>Mass Scheduling>Schedule Control>Master
Builder Option Set
The purpose of the Master Schedule Build Seq Report is to view the
order in which the sections were created by the builder during the scheduling
run.
The report lisd all course sections. Each section shows the period,
the meeting days, the term, the teacher, the room, the number enrolled,
and breaks out the number of students enrolled by gender, grade level,
and other student properties.